Quiz on Infrastructure Planning and Construction
Multiple Choice
What is the process of deciding what infrastructure should be built and how it should be built? A. Infrastructure Planning B. Infrastructure Construction C. Infrastructure Design D. Infrastructure Maintenance
What is the first step in the infrastructure planning process? A. Estimate the costs B. Identify the needs C. Analyze the risks D. Assess the impact
What is the purpose of a feasibility study? A. To determine the cost of the project B. To determine the benefits of the project C. To determine if the project is viable D. To determine the timeline of the project
What is the purpose of a risk assessment? A. To identify potential risks B. To estimate the cost of the project C. To determine the timeline of the project D. To determine the benefits of the project
True/False
- Infrastructure Planning and Construction is the same as Civil Engineering.
- Risk assessment is an important part of the infrastructure planning process.
- Feasibility studies are used to determine the cost of the project.
Fill-in-the-Blank
- The process of deciding what infrastructure should be built and how it should be built is called ___________________.
- The first step in the infrastructure planning process is to ___________________ the needs.
- A feasibility study is used to determine if the project is ___________________.
- Risk assessment is used to ___________________ potential risks.
Short Answer
- What is the difference between infrastructure planning and construction?
- What is the purpose of a risk assessment?
- What is the importance of a feasibility study?
Answer Key
Multiple Choice: 1. A - Infrastructure Planning 2. B - Identify the needs 3. C - To determine if the project is viable 4. A - To identify potential risks
True/False: 1. False 2. True 3. True
Fill-in-the-Blank: 1. Infrastructure Planning and Construction 2. Identify 3. Viable 4. Identify
Short Answer: 1. Infrastructure planning is the process of deciding what infrastructure should be built and how it should be built, while infrastructure construction is the actual process of building the infrastructure. 2. The purpose of a risk assessment is to identify potential risks that could affect the success of the project. 3. The importance of a feasibility study is to determine if the project is viable, meaning that it is likely to be successful and cost-effective.